Traffic Signals at Margaret Court
Monday, 19 April 2010 14:46
Local residents raised concerns about the sequencing of lights at the intersection of Moggill Road and Margaret Court.
Main Roads has advised the following:-
The signals are coordinated from 6am to 9.30am and from 3pm to 5pm Monday through to Friday to assist in traffic flow during peak travel times.
Pedestrians crossing Moggill Road to access the Park and Ride bus stop will cause Moggill Road traffic to stop for a period of 34 seconds.
Outside peak time the signals operate in a mode of isolation, responding to demand.












